Current Rate Schedule District 1

Meter Rate Schedule

EFFECTIVE February 14, 2018

METERED QUANTITY CHARGES PER 1,000 GALLONS

First 6,000 gallons per quarter (0 through 6,000)

$12.06

Next 94,000 gallons per quarter (6,001 through 100,000)

$ 8.59

Next 400,000 gallons per quarter (100,001 through 500,000)

$ 6.54

500,001 and over gallons

$4.82

Bulk Rate - per 1,000 gallons (0 and up)

$7.35

Water Hauler Bulk Rate - per 1,000 (plus $15 administrative fee)

$10.13

 

Provided that the minimum receipts from each meter for each quarter shall be:

METER SIZE MINIMUM CHARGE
C1, R1, I1    5/8"    (Most residences) (0-6,000 gallons) $ 72.36
C2, R3    3/4"    (0-10,000 gallons) $106.72
C3, I3, R4    1"    (0-19,000 gallons) $ 184.03
C7, I2, R2    1 1/2"    (0-41,000 gallons) $ 373.01
C5, I5, R5    2"    (0-66,000 gallons) $ 587.76
C6, I6    3"    (0-144,000 gallons) $ 1,130.14
C4, I4    4"    (0-268,000 gallons) $ 1,908.86

Typical Water Bill

  Average 
Quarterly Usage
Average 
Quarterly Bill
1-2 person household

6,000 to 12,000 gal.

$72.36 - $123.90

2-3 person household

13,000 to 20,000 gal.

$132.49 - $192.62

3-4 person household

21,000 to 30,000 gal.

$201.21 - $278.52

PRIVATE FIRE PROTECTION ANNUAL RATES:

4" Service Connection

$ 212.40

6" Service Connection

$ 476.76

8" Service Connection

$ 847.24

10" Service Connection

$ 932.28

OTHER WATER PERMIT FEES:

Far Side Connection Installation & 5/8" Meter $ 3,050.00
Near Side Connection Installation & 5/8" Meter $ 2,032.00
Far Side Connection Installation &1" Meter $ 3,505.00
Near Side Connection Installation & 1" Meter $ 2,378.00
5/8" Meter Only, Connection Already Installed, Existing Structure $ 234.00
5/8" Meter Only, Connection Already Installed, New Structure $ 300.00

Customers needing a meter larger than the standard 5/8" size will be charged the additional cost of the larger meter in addition to the above permit fees.

Permit Fee: $300 Effective July 1, 2016

Tap In Fee per EDU - $2,000 Effective as of July 1, 2016:

All new customers, shall upon connecting to the Water Distribution System, pay a tapping fee of $2,000 (determined as $500 for the capacity and $1,500 for the distribution of water) per Equivalent Dwelling Unit (E.D.U.) of water consumption as estimated and approved by the Fairview Water Authority's Engineer. One E.D.U. shall be based on a residential customer consumption of 175.5 gallons per day. The minimum Tapping Fee shall be based on one (1) E.D.U.

TURN ON / TURN OFF FEE: $35.00    $50 for Non-Payment 

This fee is charged at the time the service is turned on after having been turned off. Service may be turned off at the customer's request, such as when the customer is gone for an extended period. Service may also be turned off by the Authority due to non-payment of a customer's account. No charge shall be made for water used to extinguish accidential fires. Water for any other purpose shall not be drawn from a private fire service connection.
 

 

For questions or to report problems: 814-474-2238